|
Chapter 8 FLOODPLAIN REGULATIONS*
Section 8-18 Provisions for flood hazard reduction--General standards.
In all areas of special flood hazard the following provisions are required:
(1) New construction and substantial improvements shall be anchored to prevent flotation, collapse or lateral movement of the structure;
(2) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces;
(3) New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage;
(4) New construction and substantial improvements shall be constructed by methods and practices that minimize flood damage;
(5) Electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities shall be designed and located so as to prevent water from entering or accumulating within the components during conditions of flooding;
(6) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system;
(7) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters;
(8) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; and,
(9) Any alteration, repair, reconstruction, or improvements to a structure which is in compliance with the provisions of this chapter, shall meet the requirements of "new construction" as contained in this chapter.
(Ord. of 6-22-87)
|