Chapter 8 FLOODPLAIN REGULATIONS*
Section 8-14 Permit procedures.
Application for a development permit shall be made to the chief building official on forms furnished by him prior to any development activities, and may include, but not be limited to, the following: plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question; existing or proposed structures; fill; storage of materials; drainage facilities; and the location of the foregoing. Specifically, the following information is required:
(1) Application stage.
a. Elevation in relation to mean sea level of the proposed lowest floor, including basement, of all structures;
b. Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed;
c. Certificate from a registered professional engineer or architect that the nonresidential floodproofed structure will meet the floodproofed criteria in subsection (2) of section 8-19;
d. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development; and,
(2) Construction stage. Provide a floor elevation or floodproofing certification after the lowest floor is completed. Upon placement of the lowest floor, or floodproofing by whatever construction means, whichever is applicable, it shall be the duty of the permit holder to submit to the chief building official a certification of the elevation of the lowest floor, or floodproofed elevation, whichever is applicable, as built, in relation to mean sea level. Such certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for a particular building, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by such professional engineer or architect. Any work undertaken prior to submission of the certification shall be at the permit holder’s risk. The chief building official shall review the floor elevation survey data submitted. Deficiencies detected by such a review shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make such corrections required by this section, shall be cause to issue a stop-work order for the project.
(Ord. of 6-22-87)
|