|
Chapter 22 ZONING*
Section 22-210 Procedure for rezoning.
Prior to commencing any construction within a proposed townhouse development, an application for rezoning along with a site plan as required shall be submitted to the zoning administrator. After review by appropriate city staff, the planning and zoning commission shall hold a public hearing and shall recommend to the city council, approval with modification, or denial of the townhouse district rezoning request. The city council shall give final approval, shall give final approval with modification, or deny the townhouse district application, pursuant to the same procedure as required for any rezoning application as set forth in this zoning chapter. Each site plan submitted for review pursuant to this section shall be drawn to an appropriate engineer's scale and shall contain the following minimum requirements:
(a) Total acreage of the entire site and the density of the project calculated by dividing the total number of dwelling units by the total net acreage excluding rights-of-way dedicated to the public and storm drainage detention facilities, except as allowed in section 22-208(b). This calculated density figure shall in no event exceed the density figure listed in the density standards of this section;
(b) The approximate lot layout including lot location, size, width, depth, orientation, and minimum building setbacks;
(c) The applicant must submit drawings indicating the general architectural themes, appearance and representative building types, as well as definitive covenants, easements, dedications and restrictions to be imposed on the land, buildings and structures.
(Ord. of 12-23-96(3), VI)
|