|
Chapter 14 SEWERAGE*
Section 14-73 Location of building sewer at building.
Whenever possible the building sewer shall be brought to the building at an elevation below the footing or basement floor. No building sewer shall be laid parallel to or within three (3) feet of any bearing wall, which might thereby be weakened. The building sewer shall be laid at uniform grade and in alignment insofar as possible. Changes in direction shall be made only with properly curved pipes and fittings. No connections to inflow sources including surface water drains, roof drains or any other inflow sources identified by the city utilities engineer are permitted.
(Code 1958, 19-37; Ord. of 5-22-95(1), III)
|