Section 13-150 Notice of intent to excavate or demolish.



Prior to the adoption of 2002 (13-53 on 09/19/2002, Section 13-150 read as follows.

     (a)    Except as provided in section 13-152, before commencing  any excavation or demolition operation designated in section 13-149 each person responsible for such excavation or demolition shall serve written or telephone notice of intent to excavate or demolish at least three (3) but not  more than ten (10) full working days to the Utility Protection Center, Inc. 1990 Lakeside Parkway,  #200, Tucker, Georgia, Telephone: 404-325-5000 or 1-800-282-7411.

     (b)    The written or telephone notice required by subsection (a) of this section must contain the name, address, and telephone number of the person filing the notice of intent and, if different, the  person responsible for the excavation or demolition, the starting date, anticipated duration, and  type of excavation or demolition operation to be conducted, the location of the proposed excavation  or demolition and whether or not explosives are to be used.

     (c)    If the notification required by this section is made by telephone, an adequate record of such notification shall be maintained by the city utilities department to document compliance with the requirements of this section.

 (Code 1958,   18-47(e))